“Continuity” is a very important concept for MOSAiC. But it’s also a huge challenge in the current Arctic conditions. In the last week we’ve had so much ice movement, right out in front of the ship. We watched Met City move back and forth across the view from the bridge. Intermittently we are able to… Read More


The days fly by quickly now. The end of this leg is in sight and there is still so much to do and re-do! So it seems that the time speeds up. And the chaos has contributed to this feeling as well. Major ice dynamics running from the northwest to the southeast of us, across… Read More


I was startled by the phone call shortly after midnight. Trouble at Met City. Felix had just arrived on the bridge for his night watch from 12-4am. He always takes a look around camp when arriving for his duties. And there was no 30m mast. Simply gone. So I was roused from my sleep to… Read More


It started small, as they all do. About 1m across at the point where the spine road leads past Ocean City out towards Met City. The crack meandered and there were places to easily just step across. No major changes over the day. We went on with our daily work at Met City….. In the… Read More


Back on the 9th we had a bear around camp. He was chased away with snow machines and flares. And headed off to the north…. But then in the following day, just after we performed the major power system transplant on our L1 site, our L2 site failed. I examined all of the available information,… Read More


Our path so far has been an interesting one. The design of MOSAiC was to follow the Transpolar Drift, to follow in Nansen’s footsteps. With tons of modelling and observational analysis led by Thomas Krumpen, we selected our starting location and developed a reasonable idea of our projected or expected drift path for the year.… Read More


3 people in dark, cold outside

It all went off without a hitch or at least without a big hitch. Well planned in advance, we had the right tools and our specially concocted power system in a box. Beautiful clear skies and cold…. Below -30C for the first time at MOSAiC. The helicopter dropped us off. Dave, Hans, and I at… Read More


L1 flight as high on the agenda today… but kept getting pushed back. Including by a bear visit, which closed down most operations. But finally in the afternoon we were able to hit the air. Loaded our gear on the helicopter….. sled, ladder, shovel, feather duster (great for instrument cleaning), tool box, numerous safety bags,… Read More


frost on scientific equipment

Such an interesting feeling being so unable to respond to problems. We noticed that yesterday at some point our remote atmospheric flux station had a power failure, our fuel cell was no longer charging our batteries. But everything else kept running, living off the slowly draining batteries. We could still monitor the internal temperature, along… Read More


In the past days we’ve put some finishing touches on Met City and I’ve been documenting the detail son our field log book. Truly an amazing place with contributions from at least 14 projects from 5 countries, representing links to all 5 of the MOSAiC science teams. Of course we do atmospheric structure and surface… Read More