The FirnCover science team arrived at the EKT site approximately 100 km (~62 mi) NE of DYE 2 Sunday afternoon. The snowmobile traverse was fairly uneventful with the exception of a few “bumps on the road”. Due to the very rough ride, two of the Zarges aluminum cases flew off one of the sleds after a strap snapped… Read More
The FirnCover research team arrived safely via snowmobile at KAN-U, their first work site this campaign season. The 67 km (41.6 mi) journey from “home base” camp, Dye-2, took about 4 hours without any major difficulties. Upon arrival, it was discovered that Mike’s firm compaction tower was still standing with no apparent physical damage despite… Read More
Today’s snowmobile traverse to DYE 2 was rather uneventful at the start, but about 35 km/22 mi in, the team was faced with strong head winds and blowing snow which produced full on whiteout conditions with temperatures hovering around -30˚F. With no visibility of the horizon line for the remaining 60 km/37 mi, they exclusively depended on their GPS… Read More
The ACT-15 science team is packing up camp and traversing to DYE 2 today. Although there is still blowing wind and snow, overall the weather has much improved since yesterday’s whiteout storm. Click on the image below to track the team’s position in real time! … Read More
A text message from Mike this morning informed me that the team is held back yet another day as weather has deteriorated into whiteout conditions. However, winds are expected to calm down later in the day. If weather improves as projected, the team will begin traversing to Saddle Camp tomorrow. Considering that the team has been… Read More