wb-57-contrails

Accomplishments:

Science Flight #8

See attached pictures of Dom’s “Office” and a picture Mark took of the contrails as the plane circling on descent.

 

backseateroffice

Thursday, October 27th – No Fly Day

0900-1000 Science/Weather Brief – Tell Ru-Shan/Eric if you have a science presentation

1000-1400 Aircraft Access with power

 

Friday, October 28th – Possible Fly Day #9

0700-0800 Instrument Upload

0830 Mission Brief (Ru-Shan will represent Science.  Each instrument team can let Ru-Shan know their instrument fly status.)

1030 Estimated Take-off

1600 Estimated Landing

1630 Post Flight Brief (Send rep or inform Ru-Shan instrument update so download is not delayed)

1630-1800 Instrument Download

 

Saturday, October 29th – Down Day / Pack

 

Sunday, October 30th – No Fly / Pack

 

Monday, October 31st – WB-57 Transit