wb-57_rainbow
Accomplishments:
Low and High power engine runs were completed on Saturday and aircraft ready for a Functional Check Flight (FCF) on Monday.

Monday, October 24th – Functional Check Flight

0730-0900 Instrument Upload

0900 Mission Brief (Ru-Shan will represent Science.  Each instrument team can let Ru-Shan know their instrument fly status.)

1000 Estimated Take-off

1130 Estimated Landing

1200-1400 Instrument Download

1400 Group Photo

1430 Science Meeting (If you have data you would like to present, contact Ru-Shan.)

Tuesday, October 25th – Possible Fly Day #7
Hosted Lunch with United Maintenance
Wednesday, October 26th – Possible Fly Day #8