Accomplishments:
Low and High power engine runs were completed on Saturday and aircraft ready for a Functional Check Flight (FCF) on Monday.
Monday, October 24th – Functional Check Flight
0730-0900 Instrument Upload
0900 Mission Brief (Ru-Shan will represent Science. Each instrument team can let Ru-Shan know their instrument fly status.)
1000 Estimated Take-off
1130 Estimated Landing
1200-1400 Instrument Download
1400 Group Photo
1430 Science Meeting (If you have data you would like to present, contact Ru-Shan.)
Tuesday, October 25th – Possible Fly Day #7
Hosted Lunch with United Maintenance
Wednesday, October 26th – Possible Fly Day #8